Commercial
- Alderman’s Toyota
- The Automaster
- The Automaster Honda and Mercedes-Benz
- Best Tile
- Carbone Auto Group
- Dinse, Knapp & McAndrew
- Middlebury Natural Foods Co-op
- National Bank of Middlebury
- Orvis - Corporate Headquarters
- Orvis - Retail Flagship
- People’s United Bank
- The Automaster
- Vermont Country Store
- Vermont School Board Insurance Trust Office
Cultural
- Bennington Museum
- Camp Dudley at Kiniya
- Camp Kiniya Bath House
- Fort Ticonderoga
- Montshire Museum of Science
- Northern Stage
- Riley Rink at Hunter Park
- Southern Vermont Arts Center - Arkell Pavilion and Yester House Gallery
- St. James
- Town Hall Theater
- Town of Manchester Park House
- Town of Stowe Ice Arena
- Weston Playhouse Theatre Company
Education
- Dartmouth College - Tennis Center
- Hugh J. Gallen Career and Technical Center & Middle School
- Landmark College
- Landmark College - Click Sports Center
- Landmark College - East Academic Building
- Landmark College - Student Residences
- Northfield Mount Hermon Faculty Housing
- Northfield Mount Hermon School
- The Greenwood School Academic Center
- The Greenwood School
- University of Vermont
- University of Vermont – Harris–Millis Commons
- University of Vermont - McAuley Hall
- University of Vermont
- Vermont Academy Fuller Hall
- Vermont Technical College
- Williams College - Student Center
Healthcare
Hospitality
Manufacturing
Municipal
- Town of Antrim Police Station
- Ferrisburgh Grange Hall
- Town of Hartford
- Holman Stadium
- Lebanon Veteran’s Memorial Pool
- Mahady Courthouse
- Middlebury Police Station
- North Country SPCA Animal Shelter
- Town of Colchester Police Station
- Town of Middlebury Fire Department
- Town of Middlebury
- Town of Middlebury
- Town of Stowe
- City of Vergennes Police Station
- Williston Police and Fire Stations
Town of Colchester
Police Station
Summary
The Town of Colchester selected Bread Loaf Corporation to design and build additions and renovations to their existing Police Station. Design was finalized one month after Bread Loaf selection with Owner occupancy of the project achieved in a compressed construction schedule of six months.
The project included a 1,500 square foot sallyport addition with two holding cells and a processing area. An adjacent two-story 2,000 square foot addition accommodates needed office space on the upper floor and a fitness room, storage, and mechanical space on the lower floor. A new elevator and stairs provides accessibility and addresses life safety issues. Significant renovations to the existing two story facility included all new mechanical, electrical, plumbing and fire protection systems. Existing interior finishes were removed and re-installed after installation of four inches of spray foam insulation in the walls and twelve inches of cellulose insulation in the attic. The added insulation provides the Town to see significant energy cost savings. The total area of the completed Police Station is 15,100 square feet. Final design and construction of the project was completed on schedule and under budget.
Green Building/Sustainable Design
- Renovations to the existing facility
- Added insulation provides energy cost savings